![]() CBICC 2009 EXPO LUNCHEON SPONSORSI-99 Pyrite Solution, ERPA Team![]() Blazosky Associates, Inc. Blazosky Associates, Inc. 2006 Small Business of the year. For the ERPA project BAI served as the design engineer. We prepared design and permit application, including presentations at public meetings. Monitored construction, operation and closure activities. Provided 3rd party quality assurance and quality control inspection services, in addition to professional engineer’s construction certification. ![]() CMT Laboratories, Inc. CMT Laboratories, Inc. Geotechnical Engineer. For the ERPA we evaluated the site for geotechnical conformance to specifications during design stages and construction activities. Performed laboratory sampling and testing analysis for various construction materials used in the subbase, liner, and detection and collection systems. Monitored and evaluated subsurface conditions. ![]() Graymont (PA), Inc. Graymont (PA), Inc. provided Baghouse Lime (BHL) from its plant located in Pleasant Gap. The BHL was the necessary agent used for neutralizing the pyritic waste material in the ERPA fill area. The chemistry of the BHL had to meet certain permit requirements to ensure that the proper daily mixing ratio of Pyritic Rock-to-BHL blend was in place for in-situ treatment to be successful.
![]() HRI, Inc. HRI, Inc. General Contractor for the ERPA project, we provided earth moving and infrastructure construction activities. Excavated and constructed ERPA footprint, including: all temporary and permanent access; security control, subbase clay liner system, conveyance and storage network for infiltrate collection; infiltrate control system; aggregate and soil sourcing, delivery and placement. Transported the pyrite to the site. ![]() PennTerraEngineering, Inc. PennTerra Engineering, Inc. Small Business of the year in 2002. For the ERPA project we provided daily field survey control for the various stages of liner and cap construction activities. Services included construction stakeout of piping, liners, and storm water facilities, and certification of as-built drawings by a professional licensed surveyor. ![]() Veolia Environmental Services Veolia Environmental Services ERPA project site operations. We provided day-to-day operations including the filling, on-site treatment, surface water management and covering activities. ![]() The WHM Group sm The WHM Group sm Team Leader. Liaison between regulatory agencies, contractors, suppliers, consultants, media, public entities, local authorities and owner (PennDOT). Coordinated design, permitting, construction, operation, closure and post-closure activities. |
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
|